Aerial map of Ingleside indicating construction area

Please note that the construction of 45th Parallel Drive, extending west from Farran Drive, is scheduled to begin May 8 and reach substantial completion by August 15. The haul route of heavy trucks and equipment caused by the project will be limited to 45th Parallel and Dickinson Drive. There may be certain periods during this time when traffic is slowed or interrupted in this area.